Over the last few weeks we have been setting up for riveting
all the new plate work into place, this has included making some long series
1/2 and 5/8 rivet snaps to get into the tight spots on the frames. To date
after 1, 1/4 days of riveting we have
put in about 200 rivets along the cabin sides and veranda bottom.
The dust seals for the rear of the axles boxes are in the
process of being made, the old method used to be a sheet of ply wood with some
leather attached around it to try and keep dirt out and as much oil as possible
in, when we restored the Midland Open we decided to use some engineering plastic
instead of the ply as an experiment this proved successful and is now being tried
on the toad. Now the hole for the journal
has been cut the next process is to mill them to the correct thickness so they
fit in the back of the axle box castings and radius the corners.
The springs are now ready for collection to be overhauled
this week, hopefully most of them can be repaired
Over the last few weeks between working on the toad a few of
us have been cleaning up the buffer beams on the BR Std brake van, the draw
hook, the screw coupling have been taken off inspected, cleaned and painted. The
2 photos below show the Bath end completed and the bottom shows the Oldand end
equipment in the work shop being painted
1 comment:
Just testing.
An observation. Going to your latest entry, I then had to go back several entries to identify which vehicle you were featuring.
A suggestion! Perhaps always start with, something like, "Progress on the Toad" or "Recent work on the Toad..." or "Work on the Toad has been concentrated on....."
Not a criticism. It's all a 'learning curve'.
Post a Comment