This week we have drilled and fitted the hand brake plate.
All holes were marked and counter sunk using M16 bolts a 4" hole has also
been drilled for the hand brake shaft, I have fitted the cast hand brake column
temporally, eventually it will be bolted to the timber floor not the steal
base. The veranda sand box floor has been drilled to allow the vacuum cylinder brackets
to be fitted temporally. With this completed I have started marking out the 2
holes for the piston and cylinder hose.
No comments:
Post a Comment