The new sanctions have been fitted temporally to drill the veranda
sand box floor
The new sand box floor constructed, this will have more
holes drilled next time for the vacuum cylinder and sand box supports
The cabin end sand / ballast box floor completed, a few more
holes will need to be drilled in this for the sand pipes and fixing brackets
Everything in red primer is new
Showing the old and
new plates, the old hand brake plate will be replaced within the next few weeks
after both sand box plates are fixed down
2 pictures showing the general view of the new side sheets compare
one to when the toad arrived
No comments:
Post a Comment