This week we have drilled and fitted the hand brake plate.
All holes were marked and counter sunk using M16 bolts a 4" hole has also
been drilled for the hand brake shaft, I have fitted the cast hand brake column
temporally, eventually it will be bolted to the timber floor not the steal
base. The veranda sand box floor has been drilled to allow the vacuum cylinder brackets
to be fitted temporally. With this completed I have started marking out the 2
holes for the piston and cylinder hose.
Saturday, 31 August 2013
Thursday, 22 August 2013
The new sanctions have been fitted temporally to drill the veranda
sand box floor
The new sand box floor constructed, this will have more
holes drilled next time for the vacuum cylinder and sand box supports
The cabin end sand / ballast box floor completed, a few more
holes will need to be drilled in this for the sand pipes and fixing brackets
Everything in red primer is new
Showing the old and
new plates, the old hand brake plate will be replaced within the next few weeks
after both sand box plates are fixed down
2 pictures showing the general view of the new side sheets compare
one to when the toad arrived