Just a quick update, today we fitted the hand brake column
this included drilling a 4’ ½ hole in the timber floor and 4 x ¾ holes. As per
usual we did not have any ¾ bolts the right length so 4 were dyed down and a
split pin hole drilled in each. As you can
see it’s very tidy up that end after Dave attacked it with a hover. Martin was busy drilling the holes out on the
STD brake van so riveting can start sometime soon hopefully. The last 2 castings (as seen in the last
update) for the sand boxes have arrived and will be machined very shortly.
Hand brake column
fitted very tidy down there
Todays happy gang
No comments:
Post a Comment