Work has progressed on the BR STD slowly, most work now is
cutting the rebates for the T&G planking which will be fitted later on the up
side. We have also started making the joints
for the Down side ducket beams where they attach to the top beam. Last week this was completed and the top beam
fitted complete with the rebait the length of it.
Saturday, 11 March 2017
Thursday, 16 February 2017
IT’S BACK
Due to other commitments over the last year I have not had
enough time to carry on with the wagon blog but hopefully now I can get a few
updates in every month
GW toad 17464 is 99% complete, all that is required now is
installing the new guard’s seat when it arrives, it’s been out on a few runs
and no faults have arisen yet.
The Br STD is continuing at a pace, all the timber is being
replaced including the hard wood frames, so far the floor beams, main beams have been completed and
fitted. We are currently fitting the
upper roof frame at present. All timber
work joints are being reproduced as they were on the original van therefore
taking sometime. Photos speak lounder
than words so here are a few below.
New hand brake nut
17464 Test run
Brake van rides on the volunteers open day
GWR 813 Fund Toads 68784 and 17464 on the volunteers open day brake van rides, 68784 is rather tired now and will be subject to the same restoration that 17464 had in the next few years time
17464 Stored in the sidings
Finished Sign writing
New hardwood frame progressing on the STD
Old frame on the BR brake
New Top beam progressing, joints being cut
68784s damaged door,
Door half apart, due to swelling and damage to the door we are going to need to make a new one, some of the timber has split and is rotten
Sunday, 26 April 2015
This month the toad has been moved into the goods shed for the roof to be fitted, so far all of the planks have been placed out and all but the sides have been screwed down as these required the edged being shaped. When this is completed the roof will be sanded making it flat for the traditional canvas to be fitted
The "down" side has been rubbed down again and touched up, when the roof is completed its going to be top coated for the final time outside.
The 2 end angles (1 each end) for the roof have been ordered and should arrive this week ready for drilling, all the canvas bits have also been ordered.
Andy has been busy making the brake linkage that goes between the hand brake nut and the operating shaft, this is 80% completed.
Both toads 68784 and 17464 were taken to Meadow Court crossing
a few weeks back to see how 17464 runs i.e. no hot boxes and testing the
vacuum, so far no problems. 68784 came
as 17464 does not have a working hand brake yet.
Tuesday, 3 March 2015
The sanding gear has now nearly been completed, the Oldland
end has been connected up after the new pipe was bent and the large hole
drilled through the wall to allow the operating handle to be attached. Andy has machined 2 new sockets to allow each
end of the pipe to be attached to the operating handle and existing brackets. The large hole where the pipe goes through
the wall will need to be opened up slightly as when the operating handle is just
over half way open the pipe rubs the wall timber, then the last plate and bracket can be attached.
The timber for the roof, window frames and last reaming bits
of the wall have arrived. Martin has
made a start on the wall ends.
Dave Brooks has nearly finished replacing the worn brake
pins and Keith has started on the hand brake.
The hand brake bar was bent in several places, it’s now been straightened
and the 2 start square nut should be started soon.
A major step forward was made on Monday when 17464 was moved
side wards on to the “system” This was
not planed but with thanks to the wagon team, Marcus, Andy Gay, and John this
was achieved in 6 hrs. Also thanks to
Carl from the 4F (44123) group allowing us to borrow 2 of their large ratchets.
The next stage is to get 17464 in the shed and start the
roof.
Friday, 23 January 2015
We have concentrated getting the parts of the sanding gear
made which were missing. Last week the
Oldland end was finished, as you can see it’s currently being painted. A bit of minor work is required on the Bath
end, hopefully being finished this week.
With the Bath end nearing completion the hand brake column has been
fitted making that end look more completed, the only thing missing is the
actual hand brake!
All the sanding pipes have now been connected up, after a
few modifications to the pipes from the sanders to the rail head.
The vacuum setter pipe has been fitted, this now requires
having the bracket fitted to the wall and squared up.