Thankfully the Christmas period is over and we can get back
to normality! Between the last update
and now the sanders have been assembled and finally fitted to the chassis. Keith and Dave have made 3 new sander plugs, these
are in the cast boxes at the top where when they lifted via the operating
handle the sand drops down the pipe onto the rail head just behind the
wheel. Some of the parts were laid out
on the floor in kit form just before fitting.
The 4 cheek plates have been shaped around the edge of one
side of each sander and re bolted to the side of the toad
The last of the larger hinges have been fitted by Andy to
the main door, after a few tweaks the door can be hung at a later date after repairs
have been completed to it. Since these have
been refitted, the cabin door end sides have been refitted with the remaining timber we have and started to be painted. These will be finished when the next batch of
timber arrives hopefully mid Jan. Both
window frames have been repaired and painted by a few members. Under Dave and Bob the inside has carried
on being painted, so far the 1st top coats have been applied to the
sides and the roof hoops. When all the
timber work has finally been finished the 2nd coat will be applied
Major progress had been achieved on the BR standard brake van,
both ends have now had the concrete pored thanks to Dave Burton, Martin and
Robin, and under the end of the cabin re cast.
4 new studs holding the wooden frame down have also been cast into the
concreted at the ends. We are going to
need to drill 4 more towards the middle as the originals have sheared off. When the weather improves the plan is to
clean up the chassis, paint it, and when the toad is completed start the bottom
frame.