Work is progressing on 17464 at a steady speed now, the
double skin timber sides are nearly finished and awaiting fitting the last 3
planks each side after this the ends can be started. Due to
hardwood window frames being damaged these are going to be replaced.
The vacuum cylinder is now at the Severn Valley being overhauled.
The hand rails both side are nearly completed just the finishing
touches on the veranda end to complete
Hopefully now the sides nearly completed we can make a start
on painting the top coat and sign wiring it out when the weather permits.