Since 17464 has been re-wheeled we have fitted all the overhauled
brake gear. 16 x 1 inch bolts have been turned
down as the originals were life expired, hopefully in the next few weeks we can
drill the holes for the split pins and finish the job. 8x new brake blocks have been fitted, all of
the brake work so far has just been hung to make sure it fits, final adjustments
will be made when A, more weight is added to the toad so the veranda bows can
be linked up and B, the vacuum cylinder
and hand brake are fitted.
The protector plate to stop the screw coupling coming into
contact with the brake gear on the veranda end has been drilled and fitted. The
cabin end seat plate has been fitted, drilled and 2 holes taped.
Hopefully the timber should arrive this week so we can get
on with installing the sides and end.